Building permit applications for properties in the City of Morden are now processed by the Morden Civic Centre staff. You can visit the office from 9 am to 4 pm to check if you need a permit or to get help in completing the form.
A Building Permit is Required for: |
Does Not Require a Permit: |
|
|
A building permit is required for all buildings over ten (10) square meters in size.
It takes up to three business days for a residential building permit to be approved by MSTW; commercial building permits can take up to five business days.
Construction that starts without an approved building permit will be charged double the permit fee as a penalty.
No inspections will be performed on any projects without an approved building permit.
When the building permit has been approved by MSTW, the applicant will receive a list of all the inspections required.
The full deposit will be refunded when the project is complete if all the inspections that are required have been completed. One hundred dollars ($100.00) will be deducted from the deposit for each inspection that is missed. An Occupancy Certificate will not be issued for any residences that have missed inspections.
In the case of a new dwelling, if it is occupied prior to receiving either Interim or Final Occupancy documentation from a MSTW Building Inspector, the permit holder will be charged a $200 penalty that will be deducted from the refundable deposit.
Contact: permits@mordenmb.com or 204-822-4434